EU Lot 9 Response - Alternate Idle Allowance Proposal

22 August, 2018 | Report

EDITORS:
Luc Bisson, NVIDIA
Jay Dietrich, IBM
Jeff Doolittle, Hewlett-Packard Enterprise
Shahid Sheikh, Intel
Gary Verdun, Dell


The Green Grid SERT analysis work group has responded with a full analysis of the Draft Lot 9 regulations.  These documents outline the serious problems with the proposed allowences defined in those regulations. In addition, the SERT work group has prepared a recommended alternate allowance proposal which would lessen the arbitrariness of the currently proposed idle allowance.